RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021194 - Archived data from Tue, 11. August 2020 17:47:20 CEST


This is all the information about APD 1912021194. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021194
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2707030570/1912021194
Unit: #1027 (barcode 1309011452)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 15.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 238
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1839693 V     T = -25 °C: 345.5113038 V
Voltage for Gain 150: T = +20 °C: 388.9880507 V     T = -25 °C: 352.8559742 V
Voltage for Gain 200: T = +20 °C: 393.3308018 V     T = -25 °C: 356.9726017 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.501317555 V-1     T = -25 °C: 4.7545671 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.917587191 V-1     T = -25 °C: 9.567789912 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.53920365 V-1     T = -25 °C: 14.74128766 V-1
Break-through voltage: T = +20 °C: 408.5717405 V     T = -25 °C: 372.1725969 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:57 CET jreher Updated box and position via API.
11. Aug 2020 17:47:20 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:39 CEST jreher Updated box and position via API.
03. Apr 2020 09:44:56 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:37 CET jreher Updated box and position via API.
27. Nov 2019 20:11:11 CET jreher Updated APD location via API.
25. Nov 2019 17:29:21 CET jreher Updated box and position via API.
18. Nov 2019 18:20:34 CET spankonin Updated APD location via API.
18. Nov 2019 18:15:13 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:56 CEST Tobias Imported from Hamamatsu datasheet.