RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021185 - Archived data from Tue, 11. August 2020 17:47:26 CEST


This is all the information about APD 1912021185. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021185
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2710030773/1912021185
Unit: #932 (barcode 1309010240)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 238
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9189209 V     T = -25 °C: 344.3893397 V
Voltage for Gain 150: T = +20 °C: 387.7228253 V     T = -25 °C: 351.7453784 V
Voltage for Gain 200: T = +20 °C: 392.0458405 V     T = -25 °C: 355.8573114 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.656228797 V-1     T = -25 °C: 4.823463297 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.291028999 V-1     T = -25 °C: 9.812371286 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.66027703 V-1     T = -25 °C: 15.66143778 V-1
Break-through voltage: T = +20 °C: 406.1706786 V     T = -25 °C: 370.1505092 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:00 CET jreher Updated box and position via API.
11. Aug 2020 17:47:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:41 CEST jreher Updated box and position via API.
31. Mar 2020 08:52:39 CEST jreher Assigned to capsule by script
13. Feb 2020 14:21:51 CET jreher Updated box and position via API.
27. Nov 2019 20:11:14 CET jreher Updated APD location via API.
25. Nov 2019 17:29:24 CET jreher Updated box and position via API.
18. Nov 2019 18:20:36 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:42 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:56 CEST Tobias Imported from Hamamatsu datasheet.