Subdetector specification:  
Serial: 1912021181
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 16.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5656257 V     T = -25 °C: 346.7642244 V
Voltage for Gain 150: T = +20 °C: 390.3762529 V     T = -25 °C: 354.1691116 V
Voltage for Gain 200: T = +20 °C: 394.7102832 V     T = -25 °C: 358.3431235 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.456613424 V-1     T = -25 °C: 5.002360338 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.71021447 V-1     T = -25 °C: 9.322622769 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.25739347 V-1     T = -25 °C: 14.61151302 V-1
Break-through voltage: T = +20 °C: 410.1600789 V     T = -25 °C: 373.8153641 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:00 CET jreher Updated box and position via API.
07. Oct 2020 16:40:28 CEST jreher Assigned to capsule by script
17. Aug 2020 15:51:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:47:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:41 CEST jreher Updated box and position via API.
20. Feb 2020 13:35:29 CET jreher Updated box and position via API.
27. Nov 2019 20:11:13 CET jreher Updated APD location via API.
25. Nov 2019 17:29:23 CET jreher Updated box and position via API.
18. Nov 2019 18:20:36 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:41 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:55 CEST Tobias Imported from Hamamatsu datasheet.