RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021179 - Archived data from Mon, 17. August 2020 15:53:45 CEST


This is all the information about APD 1912021179. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021179
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 17.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9281488 V     T = -25 °C: 344.4125714 V
Voltage for Gain 150: T = +20 °C: 387.6973876 V     T = -25 °C: 351.760803 V
Voltage for Gain 200: T = +20 °C: 392.0006475 V     T = -25 °C: 355.8858456 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.682829855 V-1     T = -25 °C: 4.809581357 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.389550934 V-1     T = -25 °C: 9.735910966 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70067718 V-1     T = -25 °C: 15.48262676 V-1
Break-through voltage: T = +20 °C: 406.0731784 V     T = -25 °C: 371.3543304 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:00 CET jreher Updated box and position via API.
07. Oct 2020 12:11:05 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:45 CEST jreher Updated box and position via API.
11. Aug 2020 17:47:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:13 CET jreher Updated APD location via API.
25. Nov 2019 17:29:23 CET jreher Updated box and position via API.
18. Nov 2019 18:20:36 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:41 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:55 CEST Tobias Imported from Hamamatsu datasheet.