RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021178 - Archived data from Tue, 11. August 2020 17:47:25 CEST


This is all the information about APD 1912021178. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021178
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1912021178/2511028370
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.9 V
Dark current: 14.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 238
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6216931 V     T = -25 °C: 342.3001354 V
Voltage for Gain 150: T = +20 °C: 385.4256862 V     T = -25 °C: 349.6183061 V
Voltage for Gain 200: T = +20 °C: 389.7483738 V     T = -25 °C: 353.723599 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.430005494 V-1     T = -25 °C: 4.871681413 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.610259049 V-1     T = -25 °C: 9.91008006 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95527952 V-1     T = -25 °C: 15.70872376 V-1
Break-through voltage: T = +20 °C: 402.1085962 V     T = -25 °C: 368.0998351 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:00 CET jreher Updated box and position via API.
11. Aug 2020 17:47:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:41 CEST jreher Updated box and position via API.
03. Apr 2020 09:46:37 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:01 CET jreher Updated box and position via API.
27. Nov 2019 20:11:13 CET jreher Updated APD location via API.
25. Nov 2019 17:29:23 CET jreher Updated box and position via API.
18. Nov 2019 18:20:36 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:41 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:55 CEST Tobias Imported from Hamamatsu datasheet.