RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021172 - Archived data from Tue, 11. August 2020 17:47:24 CEST


This is all the information about APD 1912021172. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021172
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 14.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4333389 V     T = -25 °C: 343.2985363 V
Voltage for Gain 150: T = +20 °C: 386.2318606 V     T = -25 °C: 350.6086435 V
Voltage for Gain 200: T = +20 °C: 390.5597748 V     T = -25 °C: 354.6830828 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.494334286 V-1     T = -25 °C: 4.733332638 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.83290682 V-1     T = -25 °C: 9.872452837 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.5183115 V-1     T = -25 °C: 15.95940866 V-1
Break-through voltage: T = +20 °C: 400.6741039 V     T = -25 °C: 369.3329924 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:18:59 CET jreher Updated box and position via API.
11. Aug 2020 17:47:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:40 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:13 CET jreher Updated APD location via API.
25. Nov 2019 17:29:23 CET jreher Updated box and position via API.
18. Nov 2019 18:20:35 CET spankonin Updated APD location via API.
18. Nov 2019 18:15:14 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:55 CEST Tobias Imported from Hamamatsu datasheet.