RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021168 - Archived data from Fri, 05. February 2021 11:18:59 CET


This is all the information about APD 1912021168. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021168
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G13
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 27 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.1422238 V     T = -25 °C: 342.3782861 V
Voltage for Gain 150: T = +20 °C: 385.0192207 V     T = -25 °C: 349.6515755 V
Voltage for Gain 200: T = +20 °C: 389.3971886 V     T = -25 °C: 353.6897831 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.52082572 V-1     T = -25 °C: 4.925265909 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.910934261 V-1     T = -25 °C: 10.2086753 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55135697 V-1     T = -25 °C: 16.57211202 V-1
Break-through voltage: T = +20 °C: 400.7554335 V     T = -25 °C: 367.3057819 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:18:59 CET jreher Updated box and position via API.
11. Aug 2020 17:47:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:40 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:12 CET jreher Updated APD location via API.
25. Nov 2019 17:29:22 CET jreher Updated box and position via API.
18. Nov 2019 18:20:35 CET spankonin Updated APD location via API.
18. Nov 2019 18:15:14 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:55 CEST Tobias Imported from Hamamatsu datasheet.