Show Hamamatsu Avalanche Photo Diode 1911021126 - Archived data from Fri, 05. February 2021 11:19:01 CET


This is all the information about APD 1911021126. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021126
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 15.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.0279135 V     T = -25 °C: 342.2322242 V
Voltage for Gain 150: T = +20 °C: 384.8724119 V     T = -25 °C: 349.5059631 V
Voltage for Gain 200: T = +20 °C: 389.2326063 V     T = -25 °C: 353.6034953 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.633458461 V-1     T = -25 °C: 4.939001488 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.180642202 V-1     T = -25 °C: 9.214638166 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35530328 V-1     T = -25 °C: 16.59618751 V-1
Break-through voltage: T = +20 °C: 404.0266286 V     T = -25 °C: 368.1411839 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:19:01 CET jreher Updated box and position via API.
11. Aug 2020 17:47:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:14 CET jreher Updated APD location via API.
25. Nov 2019 17:29:24 CET jreher Updated box and position via API.
18. Nov 2019 18:20:36 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:42 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.