RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021121 - Archived data from Tue, 11. August 2020 17:47:54 CEST


This is all the information about APD 1911021121. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021121
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.3 V
Dark current: 12.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 245
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7261169 V     T = -25 °C: 341.5181121 V
Voltage for Gain 150: T = +20 °C: 384.5885998 V     T = -25 °C: 348.8420572 V
Voltage for Gain 200: T = +20 °C: 388.9504265 V     T = -25 °C: 352.8565292 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.701865514 V-1     T = -25 °C: 4.767757874 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.248654668 V-1     T = -25 °C: 9.598508409 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.45373833 V-1     T = -25 °C: 16.02908805 V-1
Break-through voltage: T = +20 °C: 402.524812 V     T = -25 °C: 367.4650551 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:51 CET jreher Updated box and position via API.
11. Aug 2020 17:47:54 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:19 CET jreher Updated APD location via API.
25. Nov 2019 17:29:44 CET jreher Updated box and position via API.
21. Nov 2019 16:52:27 CET spankonin Updated APD location via API.
21. Nov 2019 16:48:31 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.