RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021113 - Archived data from Tue, 11. August 2020 17:47:53 CEST


This is all the information about APD 1911021113. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021113
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.7 V
Dark current: 22.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 245
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7013364 V     T = -25 °C: 341.4326713 V
Voltage for Gain 150: T = +20 °C: 384.5581323 V     T = -25 °C: 348.7687188 V
Voltage for Gain 200: T = +20 °C: 388.9185588 V     T = -25 °C: 352.7793649 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.68118712 V-1     T = -25 °C: 4.779128664 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.346272022 V-1     T = -25 °C: 9.730281793 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59665604 V-1     T = -25 °C: 16.36671291 V-1
Break-through voltage: T = +20 °C: 404.0188134 V     T = -25 °C: 367.8112217 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:50 CET jreher Updated box and position via API.
11. Aug 2020 17:47:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:40 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:19 CET jreher Updated APD location via API.
25. Nov 2019 17:29:44 CET jreher Updated box and position via API.
21. Nov 2019 16:52:26 CET spankonin Updated APD location via API.
21. Nov 2019 16:48:31 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.