RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021110 - Archived data from Tue, 11. August 2020 17:47:52 CEST


This is all the information about APD 1911021110. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021110
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 400 V
Voltage for Gain 100 (T=+25°C): 373.6 V
Dark current: 15.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 245
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.5727029 V     T = -25 °C: 339.1812423 V
Voltage for Gain 150: T = +20 °C: 381.4477187 V     T = -25 °C: 346.4302755 V
Voltage for Gain 200: T = +20 °C: 385.8360542 V     T = -25 °C: 350.4953915 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.408075 V-1     T = -25 °C: 4.95213799 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.296234186 V-1     T = -25 °C: 10.08961442 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36586299 V-1     T = -25 °C: 16.1535476 V-1
Break-through voltage: T = +20 °C: 397.8309793 V     T = -25 °C: 363.9725621 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:49 CET jreher Updated box and position via API.
11. Aug 2020 17:47:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:40 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:19 CET jreher Updated APD location via API.
25. Nov 2019 17:29:44 CET jreher Updated box and position via API.
21. Nov 2019 16:52:26 CET spankonin Updated APD location via API.
21. Nov 2019 16:49:48 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.