RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021100 - Archived data from Wed, 07. October 2020 12:28:12 CEST


This is all the information about APD 1911021100. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021100
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1911021100/0812008149
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 15 nA
   
Screening Logistics:  
Available: No
Storage Box: 239
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7477076 V     T = -25 °C: 343.6000428 V
Voltage for Gain 150: T = +20 °C: 386.5910261 V     T = -25 °C: 350.9324867 V
Voltage for Gain 200: T = +20 °C: 390.9486192 V     T = -25 °C: 355.0701244 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.663798351 V-1     T = -25 °C: 4.728468418 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.240882171 V-1     T = -25 °C: 9.411933909 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31315376 V-1     T = -25 °C: 14.85626048 V-1
Break-through voltage: T = +20 °C: 405.9962445 V     T = -25 °C: 369.8112005 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:05 CET jreher Updated box and position via API.
07. Oct 2020 12:28:12 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:41 CEST jreher Updated box and position via API.
11. Aug 2020 17:47:29 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:48 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:22 CET jreher Updated APD location via API.
25. Nov 2019 17:29:26 CET jreher Updated box and position via API.
18. Nov 2019 18:20:55 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:43 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.