RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021097 - Archived data from Wed, 07. October 2020 15:44:02 CEST


This is all the information about APD 1911021097. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021097
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 20.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.1343744 V     T = -25 °C: 342.1000936 V
Voltage for Gain 150: T = +20 °C: 384.9609458 V     T = -25 °C: 349.3719754 V
Voltage for Gain 200: T = +20 °C: 389.330783 V     T = -25 °C: 353.4716727 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.585066165 V-1     T = -25 °C: 4.985364047 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.004643867 V-1     T = -25 °C: 9.225639748 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.98314767 V-1     T = -25 °C: 16.56510572 V-1
Break-through voltage: T = +20 °C: 404.3236608 V     T = -25 °C: 368.0667089 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:04 CET jreher Updated box and position via API.
07. Oct 2020 15:44:02 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:29 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:48 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:22 CET jreher Updated APD location via API.
25. Nov 2019 17:29:25 CET jreher Updated box and position via API.
18. Nov 2019 18:20:55 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:43 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.