RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021090 - Archived data from Tue, 11. August 2020 17:48:00 CEST


This is all the information about APD 1911021090. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021090
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 245
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5470629 V     T = -25 °C: 347.5925375 V
Voltage for Gain 150: T = +20 °C: 391.4029982 V     T = -25 °C: 354.9532723 V
Voltage for Gain 200: T = +20 °C: 395.7619257 V     T = -25 °C: 359.2192271 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.390838228 V-1     T = -25 °C: 4.652335934 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.556383647 V-1     T = -25 °C: 9.074636107 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79019298 V-1     T = -25 °C: 14.16503996 V-1
Break-through voltage: T = +20 °C: 410.0854429 V     T = -25 °C: 374.6023001 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:52 CET jreher Updated box and position via API.
11. Aug 2020 17:48:00 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:20 CET jreher Updated APD location via API.
25. Nov 2019 17:29:45 CET jreher Updated box and position via API.
21. Nov 2019 16:52:28 CET spankonin Updated APD location via API.
21. Nov 2019 16:48:32 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:53 CEST Tobias Imported from Hamamatsu datasheet.