RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021086 - Archived data from Tue, 11. August 2020 17:47:57 CEST


This is all the information about APD 1911021086. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021086
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 245
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4246367 V     T = -25 °C: 348.6429531 V
Voltage for Gain 150: T = +20 °C: 392.2530363 V     T = -25 °C: 355.9715172 V
Voltage for Gain 200: T = +20 °C: 396.6043232 V     T = -25 °C: 360.2267869 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43352849 V-1     T = -25 °C: 4.940208562 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.711183654 V-1     T = -25 °C: 9.295710694 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17220058 V-1     T = -25 °C: 14.39196834 V-1
Break-through voltage: T = +20 °C: 412.0136644 V     T = -25 °C: 375.9974961 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:51 CET jreher Updated box and position via API.
11. Aug 2020 17:47:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:20 CET jreher Updated APD location via API.
25. Nov 2019 17:29:45 CET jreher Updated box and position via API.
21. Nov 2019 16:52:27 CET spankonin Updated APD location via API.
21. Nov 2019 16:48:32 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:53 CEST Tobias Imported from Hamamatsu datasheet.