RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021072 - Archived data from Tue, 11. August 2020 17:47:32 CEST


This is all the information about APD 1911021072. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021072
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378 V
Dark current: 23.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4648933 V     T = -25 °C: 343.0959904 V
Voltage for Gain 150: T = +20 °C: 386.3021283 V     T = -25 °C: 350.4453312 V
Voltage for Gain 200: T = +20 °C: 390.6440731 V     T = -25 °C: 354.5670827 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.441094195 V-1     T = -25 °C: 4.889054367 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.658677678 V-1     T = -25 °C: 9.079457716 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07597665 V-1     T = -25 °C: 16.05053155 V-1
Break-through voltage: T = +20 °C: 399.630356 V     T = -25 °C: 368.5452557 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:06 CET jreher Updated box and position via API.
07. Oct 2020 15:44:03 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:49 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:23 CET jreher Updated APD location via API.
25. Nov 2019 17:29:27 CET jreher Updated box and position via API.
18. Nov 2019 18:20:56 CET spankonin Updated APD location via API.
18. Nov 2019 18:13:31 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:53 CEST Tobias Imported from Hamamatsu datasheet.