RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021067 - Archived data from Tue, 11. August 2020 17:47:31 CEST


This is all the information about APD 1910021067. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021067
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5764376 V     T = -25 °C: 345.9154911 V
Voltage for Gain 150: T = +20 °C: 389.4036616 V     T = -25 °C: 353.3917736 V
Voltage for Gain 200: T = +20 °C: 393.7469641 V     T = -25 °C: 357.5541776 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.431214212 V-1     T = -25 °C: 5.080461 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.684580946 V-1     T = -25 °C: 8.956936096 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.11744535 V-1     T = -25 °C: 18.95964946 V-1
Break-through voltage: T = +20 °C: 410.093283 V     T = -25 °C: 373.0035462 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:05 CET jreher Updated box and position via API.
07. Oct 2020 15:44:03 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:31 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:49 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:23 CET jreher Updated APD location via API.
25. Nov 2019 17:29:26 CET jreher Updated box and position via API.
18. Nov 2019 18:20:56 CET spankonin Updated APD location via API.
18. Nov 2019 18:13:30 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:53 CEST Tobias Imported from Hamamatsu datasheet.