RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021060 - Archived data from Tue, 11. August 2020 17:47:14 CEST


This is all the information about APD 1910021060. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021060
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0823008991/1910021060
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 23.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 237
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6155321 V     T = -25 °C: 343.319518 V
Voltage for Gain 150: T = +20 °C: 386.4363674 V     T = -25 °C: 350.6619043 V
Voltage for Gain 200: T = +20 °C: 390.7763348 V     T = -25 °C: 354.779065 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.412333471 V-1     T = -25 °C: 4.846231129 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.649328415 V-1     T = -25 °C: 9.905795671 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.06105834 V-1     T = -25 °C: 15.85439331 V-1
Break-through voltage: T = +20 °C: 401.6669686 V     T = -25 °C: 369.7099704 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:51 CET jreher Updated box and position via API.
11. Aug 2020 17:47:14 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:30 CEST jreher Updated box and position via API.
03. Apr 2020 09:59:25 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:19 CET jreher Updated box and position via API.
27. Nov 2019 20:11:01 CET jreher Updated APD location via API.
25. Nov 2019 17:29:18 CET jreher Updated box and position via API.
18. Nov 2019 18:20:05 CET spankonin Updated APD location via API.
18. Nov 2019 18:15:53 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:03 CEST Tobias Imported from Hamamatsu datasheet.