RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021054 - Archived data from Tue, 11. August 2020 17:47:13 CEST


This is all the information about APD 1910021054. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021054
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1910021054/2304024473
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 17.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 237
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8496522 V     T = -25 °C: 346.1513385 V
Voltage for Gain 150: T = +20 °C: 389.6395306 V     T = -25 °C: 353.5356329 V
Voltage for Gain 200: T = +20 °C: 393.9432143 V     T = -25 °C: 357.6692322 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.683364467 V-1     T = -25 °C: 4.867807417 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.411088546 V-1     T = -25 °C: 9.012758732 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85286214 V-1     T = -25 °C: 15.91713888 V-1
Break-through voltage: T = +20 °C: 409.2167454 V     T = -25 °C: 372.9932047 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:51 CET jreher Updated box and position via API.
11. Aug 2020 17:47:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:30 CEST jreher Updated box and position via API.
31. Mar 2020 08:53:28 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:09 CET jreher Updated box and position via API.
27. Nov 2019 20:11:01 CET jreher Updated APD location via API.
25. Nov 2019 17:29:17 CET jreher Updated box and position via API.
18. Nov 2019 18:20:05 CET spankonin Updated APD location via API.
18. Nov 2019 18:15:53 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:03 CEST Tobias Imported from Hamamatsu datasheet.