RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021049 - Archived data from Wed, 07. October 2020 12:16:08 CEST


This is all the information about APD 1910021049. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021049
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1910021049/2313025269
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 237
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4798915 V     T = -25 °C: 345.030455 V
Voltage for Gain 150: T = +20 °C: 388.3286954 V     T = -25 °C: 352.4214541 V
Voltage for Gain 200: T = +20 °C: 392.6921066 V     T = -25 °C: 356.572705 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.445394435 V-1     T = -25 °C: 4.911231962 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.664571097 V-1     T = -25 °C: 9.038696035 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96341365 V-1     T = -25 °C: 16.04184091 V-1
Break-through voltage: T = +20 °C: 408.0869762 V     T = -25 °C: 371.9539874 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:50 CET jreher Updated box and position via API.
07. Oct 2020 12:16:08 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:06 CEST jreher Updated box and position via API.
11. Aug 2020 17:47:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:29 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:01 CET jreher Updated APD location via API.
25. Nov 2019 17:29:17 CET jreher Updated box and position via API.
18. Nov 2019 18:20:04 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:20 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:03 CEST Tobias Imported from Hamamatsu datasheet.