RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021048 - Archived data from Tue, 11. August 2020 17:47:12 CEST


This is all the information about APD 1910021048. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021048
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 18.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 237
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8190081 V     T = -25 °C: 344.834921 V
Voltage for Gain 150: T = +20 °C: 388.6235365 V     T = -25 °C: 352.2971546 V
Voltage for Gain 200: T = +20 °C: 392.9542827 V     T = -25 °C: 356.5158545 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.703667575 V-1     T = -25 °C: 4.935032672 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.36788867 V-1     T = -25 °C: 9.078042849 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56874389 V-1     T = -25 °C: 16.04490385 V-1
Break-through voltage: T = +20 °C: 407.8134981 V     T = -25 °C: 371.6746002 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:50 CET jreher Updated box and position via API.
11. Aug 2020 17:47:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:29 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:00 CET jreher Updated APD location via API.
25. Nov 2019 17:29:17 CET jreher Updated box and position via API.
18. Nov 2019 18:20:04 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:20 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:03 CEST Tobias Imported from Hamamatsu datasheet.