RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0717006647 - Archived data from Tue, 11. August 2020 17:57:01 CEST


This is all the information about APD 0717006647. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0717006647
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 386.9 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 76
Position in grid: 8
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 386.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2632206 V     T = -25 °C: 352.5695692 V
Voltage for Gain 150: T = +20 °C: 395.1535129 V     T = -25 °C: 360.1414389 V
Voltage for Gain 200: T = +20 °C: 399.5431305 V     T = -25 °C: 364.3192712 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.479615427 V-1     T = -25 °C: 4.615783012 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.737930471 V-1     T = -25 °C: 9.014907429 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.14596601 V-1     T = -25 °C: 13.95134368 V-1
Break-through voltage: T = +20 °C: 417.3281185 V     T = -25 °C: 380.1481527 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:53 CET jreher Updated box and position via API.
11. Aug 2020 17:57:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:41 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:31 CEST jreher Updated box and position via API.
19. Dec 2019 15:51:13 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:44 CET jreher Updated box and position via API.
10. Aug 2017 14:50:33 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:56:14 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:32 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:48:59 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:11 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:16 CEST Tobias Imported from Hamamatsu datasheet.