RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021026 - Archived data from Tue, 11. August 2020 17:47:15 CEST


This is all the information about APD 1910021026. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021026
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 16.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 237
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0990376 V     T = -25 °C: 344.4648057 V
Voltage for Gain 150: T = +20 °C: 387.9207057 V     T = -25 °C: 351.8247161 V
Voltage for Gain 200: T = +20 °C: 392.2698579 V     T = -25 °C: 355.9636249 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.577625825 V-1     T = -25 °C: 4.777213274 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.081310301 V-1     T = -25 °C: 9.674924879 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1175512 V-1     T = -25 °C: 15.32436196 V-1
Break-through voltage: T = +20 °C: 407.6656214 V     T = -25 °C: 371.1923005 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:52 CET jreher Updated box and position via API.
11. Aug 2020 17:47:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:31 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:02 CET jreher Updated APD location via API.
25. Nov 2019 17:29:18 CET jreher Updated box and position via API.
18. Nov 2019 18:20:06 CET spankonin Updated APD location via API.
18. Nov 2019 18:15:54 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:02 CEST Tobias Imported from Hamamatsu datasheet.