RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021020 - Archived data from Tue, 11. August 2020 17:47:51 CEST


This is all the information about APD 1910021020. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021020
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2514028638/1910021020
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 20.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 245
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9526222 V     T = -25 °C: 342.451246 V
Voltage for Gain 150: T = +20 °C: 385.8139047 V     T = -25 °C: 349.7857857 V
Voltage for Gain 200: T = +20 °C: 390.1865896 V     T = -25 °C: 353.8935477 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.616964519 V-1     T = -25 °C: 4.78261048 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.134141656 V-1     T = -25 °C: 9.804802982 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.23001129 V-1     T = -25 °C: 15.60043872 V-1
Break-through voltage: T = +20 °C: 405.0012193 V     T = -25 °C: 368.5023317 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:48 CET jreher Updated box and position via API.
11. Aug 2020 17:47:51 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:39 CEST jreher Updated box and position via API.
03. Apr 2020 10:08:44 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:06 CET jreher Updated box and position via API.
27. Nov 2019 20:12:18 CET jreher Updated APD location via API.
25. Nov 2019 17:29:43 CET jreher Updated box and position via API.
21. Nov 2019 16:52:25 CET spankonin Updated APD location via API.
21. Nov 2019 16:49:48 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:02 CEST Tobias Imported from Hamamatsu datasheet.