RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1910021016 - Archived data from Tue, 11. August 2020 17:47:50 CEST


This is all the information about APD 1910021016. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1910021016
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 13.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 245
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6803072 V     T = -25 °C: 345.0406305 V
Voltage for Gain 150: T = +20 °C: 388.5666385 V     T = -25 °C: 352.4490304 V
Voltage for Gain 200: T = +20 °C: 392.932865 V     T = -25 °C: 356.6080137 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.383020863 V-1     T = -25 °C: 4.899261397 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.347574756 V-1     T = -25 °C: 9.057759866 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6127054 V-1     T = -25 °C: 15.95558206 V-1
Break-through voltage: T = +20 °C: 408.41171 V     T = -25 °C: 371.8832872 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:48 CET jreher Updated box and position via API.
08. Dec 2020 17:11:02 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:53 CEST jreher Updated box and position via API.
11. Aug 2020 17:47:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:39 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:18 CET jreher Updated APD location via API.
25. Nov 2019 17:29:42 CET jreher Updated box and position via API.
21. Nov 2019 16:52:25 CET spankonin Updated APD location via API.
21. Nov 2019 16:49:47 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:02 CEST Tobias Imported from Hamamatsu datasheet.