RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0717006644 - Archived data from Wed, 16. June 2021 15:53:04 CEST


This is all the information about APD 0717006644. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0717006644
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 76
Position in grid: 2
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 388.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.554671 V     T = -25 °C: 352.7195714 V
Voltage for Gain 150: T = +20 °C: 396.4957653 V     T = -25 °C: 360.1585354 V
Voltage for Gain 200: T = +20 °C: 400.9021417 V     T = -25 °C: 364.3577462 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.388746092 V-1     T = -25 °C: 4.993938503 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.450401353 V-1     T = -25 °C: 9.217404781 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48867264 V-1     T = -25 °C: 14.39409888 V-1
Break-through voltage: T = +20 °C: 416.6728911 V     T = -25 °C: 379.9357478 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:15:17 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:12 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:24 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:52 CET jreher Updated box and position via API.
11. Aug 2020 17:57:00 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:31 CEST jreher Updated box and position via API.
19. Dec 2019 15:51:13 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:43 CET jreher Updated box and position via API.
10. Aug 2017 14:50:33 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:56:14 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:31 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:48:59 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:11 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:16 CEST Tobias Imported from Hamamatsu datasheet.