RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1909020942 - Archived data from Tue, 11. August 2020 17:47:49 CEST


This is all the information about APD 1909020942. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1909020942
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 245
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4809843 V     T = -25 °C: 349.6924905 V
Voltage for Gain 150: T = +20 °C: 393.338799 V     T = -25 °C: 357.1560615 V
Voltage for Gain 200: T = +20 °C: 397.6878808 V     T = -25 °C: 361.3641572 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.434568449 V-1     T = -25 °C: 4.633741356 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.708059556 V-1     T = -25 °C: 9.23483527 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21460244 V-1     T = -25 °C: 14.44919744 V-1
Break-through voltage: T = +20 °C: 411.9608412 V     T = -25 °C: 375.8619139 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:48 CET jreher Updated box and position via API.
11. Aug 2020 17:47:49 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:38 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:17 CET jreher Updated APD location via API.
25. Nov 2019 17:29:42 CET jreher Updated box and position via API.
21. Nov 2019 16:52:25 CET spankonin Updated APD location via API.
21. Nov 2019 16:49:47 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:00 CEST Tobias Imported from Hamamatsu datasheet.