RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1909020928 - Archived data from Fri, 05. February 2021 11:22:03 CET


This is all the information about APD 1909020928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1909020928
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 16.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 262
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8058213 V     T = -25 °C: 346.98663 V
Voltage for Gain 150: T = +20 °C: 390.6012021 V     T = -25 °C: 354.405523 V
Voltage for Gain 200: T = +20 °C: 394.9071279 V     T = -25 °C: 358.5744842 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.697724541 V-1     T = -25 °C: 4.923567192 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.446290195 V-1     T = -25 °C: 9.043222898 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.86851394 V-1     T = -25 °C: 16.06021624 V-1
Break-through voltage: T = +20 °C: 410.1082906 V     T = -25 °C: 373.8120218 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:01 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:25 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:22:03 CET jreher Updated box and position via API.
11. Aug 2020 17:49:21 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:42 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:59 CET jreher Updated APD location via API.
25. Nov 2019 17:30:32 CET jreher Updated box and position via API.
25. Nov 2019 17:19:37 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:00 CEST Tobias Imported from Hamamatsu datasheet.