RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0716006616 - Archived data from Wed, 03. August 2016 16:02:31 CEST


This is all the information about APD 0716006616. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0716006616
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 12.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 55
Position in grid: 6
Arrival for irradiation: 10. Jul 2016
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 12. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 3
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 12. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:09:04 CEST jreher Updated APD location via API.
06. Oct 2016 09:44:47 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:02:46 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:02:31 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 14:57:36 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 13:59:15 CEST markus.moritz Entered irradiation information.
01. Aug 2016 17:27:48 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:15 CEST Tobias Imported from Hamamatsu datasheet.