RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1907020759 - Archived data from Tue, 11. August 2020 17:34:37 CEST


This is all the information about APD 1907020759. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1907020759
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.7 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 188
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.5190757 V     T = -25 °C: 339.8439811 V
Voltage for Gain 150: T = +20 °C: 382.3539316 V     T = -25 °C: 347.0864099 V
Voltage for Gain 200: T = +20 °C: 386.7242042 V     T = -25 °C: 351.1834301 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.463095302 V-1     T = -25 °C: 5.105821856 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.637755316 V-1     T = -25 °C: 9.535072285 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99872994 V-1     T = -25 °C: 15.09173285 V-1
Break-through voltage: T = +20 °C: 402.0997362 V     T = -25 °C: 365.9897208 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:12:38 CET jreher Updated box and position via API.
11. Aug 2020 17:34:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:02:20 CET jreher Updated APD location via API.
25. Nov 2019 17:25:43 CET jreher Updated box and position via API.
13. Aug 2019 12:17:13 CEST jreher Updated APD location via API.
05. Aug 2019 17:05:19 CEST jreher Updated APD batch assignment via API.
30. Jul 2019 12:29:49 CEST markus.moritz
30. Jul 2019 12:28:35 CEST markus.moritz
23. Jun 2016 11:48:56 CEST Tobias Imported from Hamamatsu datasheet.