RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1906020713 - Archived data from Tue, 11. August 2020 17:35:23 CEST


This is all the information about APD 1906020713. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1906020713
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 12.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 193
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.4327459 V     T = -25 °C: 341.2680105 V
Voltage for Gain 150: T = +20 °C: 384.2014364 V     T = -25 °C: 348.5517889 V
Voltage for Gain 200: T = +20 °C: 388.5230783 V     T = -25 °C: 352.6317624 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.510956579 V-1     T = -25 °C: 4.919539205 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.847693773 V-1     T = -25 °C: 10.03706311 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.52013534 V-1     T = -25 °C: 16.1218623 V-1
Break-through voltage: T = +20 °C: 403.6695856 V     T = -25 °C: 367.3990711 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:17 CET jreher Updated box and position via API.
07. Oct 2020 12:15:59 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:04 CEST jreher Updated box and position via API.
11. Aug 2020 17:35:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:14 CET jreher Updated APD location via API.
25. Nov 2019 17:26:06 CET jreher Updated box and position via API.
16. Aug 2019 12:20:48 CEST jreher Updated APD location via API.
09. Aug 2019 16:30:45 CEST jreher Updated APD batch assignment via API.
31. Jul 2019 12:53:00 CEST markus.moritz
23. Jun 2016 11:48:55 CEST Tobias Imported from Hamamatsu datasheet.