RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1905020610 - Archived data from Tue, 11. August 2020 18:09:55 CEST


This is all the information about APD 1905020610. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1905020610
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 400 V
Voltage for Gain 100 (T=+25°C): 371.3 V
Dark current: 13.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 269
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4039584 V     T = -25 °C: 336.8902249 V
Voltage for Gain 150: T = +20 °C: 385.5163713 V     T = -25 °C: 344.2955963 V
Voltage for Gain 200: T = +20 °C: 389.0428624 V     T = -25 °C: 348.4928952 V
Gain/Voltage slope at M = 100: T = +20 °C: 5.57213767 V-1     T = -25 °C: 4.971815773 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 12.0974679 V-1     T = -25 °C: 9.119671392 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.68777369 V-1     T = -25 °C: 15.98102053 V-1
Break-through voltage: T = +20 °C: 391.6285526 V     T = -25 °C: 363.3656113 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:58 CET jreher Updated box and position via API.
11. Aug 2020 18:09:55 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:07 CEST jreher Updated APD location via API.
21. Jul 2020 14:35:57 CEST jreher Updated box and position via API.
29. Jun 2020 16:12:23 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:52 CEST Tobias Imported from Hamamatsu datasheet.