RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1905020603 - Archived data from Tue, 11. August 2020 18:09:54 CEST


This is all the information about APD 1905020603. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1905020603
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 401 V
Voltage for Gain 100 (T=+25°C): 373.4 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 269
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 338.4074403 V     T = -25 °C: 338.013765 V
Voltage for Gain 150: T = +20 °C: 352.5817034 V     T = -25 °C: 345.4098928 V
Voltage for Gain 200: T = +20 °C: 361.3327945 V     T = -25 °C: 349.5937281 V
Gain/Voltage slope at M = 100: T = +20 °C: 2.68538762 V-1     T = -25 °C: 4.951372693 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 4.630967157 V-1     T = -25 °C: 9.061766728 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 6.980066194 V-1     T = -25 °C: 15.90086095 V-1
Break-through voltage: T = +20 °C: 400.7086628 V     T = -25 °C: 364.6506747 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:57 CET jreher Updated box and position via API.
11. Aug 2020 18:09:54 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:06 CEST jreher Updated APD location via API.
21. Jul 2020 14:35:57 CEST jreher Updated box and position via API.
29. Jun 2020 16:12:22 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:52 CEST Tobias Imported from Hamamatsu datasheet.