RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1903020509 - Archived data from Tue, 11. August 2020 18:08:28 CEST


This is all the information about APD 1903020509. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1903020509
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 399 V
Voltage for Gain 100 (T=+25°C): 371 V
Dark current: 13.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 318
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9858973 V     T = -25 °C: 351.0044748 V
Voltage for Gain 150: T = +20 °C: 384.9311304 V     T = -25 °C: 355.4689191 V
Voltage for Gain 200: T = +20 °C: 399.0528244 V     T = -25 °C: 357.3843323 V
Gain/Voltage slope at M = 100: T = +20 °C: 95.22643501 V-1     T = -25 °C: 15.56899872 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.219036316 V-1     T = -25 °C: 32.80406434 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 426441.461 V-1     T = -25 °C: 33.7778389 V-1
Break-through voltage: T = +20 °C: 398.9266653 V     T = -25 °C: 363.0780461 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:29:06 CET jreher Updated box and position via API.
11. Aug 2020 18:08:28 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:49 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:39 CEST jreher Updated box and position via API.
29. Jun 2020 15:58:28 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:50 CEST Tobias Imported from Hamamatsu datasheet.