RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1903020504 - Archived data from Tue, 11. August 2020 18:08:27 CEST


This is all the information about APD 1903020504. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1903020504
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 22.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 318
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5386321 V     T = -25 °C: 358.3220509 V
Voltage for Gain 150: T = +20 °C: 380.8383776 V     T = -25 °C: 362.4771404 V
Voltage for Gain 200: T = +20 °C: 384.5520468 V     T = -25 °C: 364.4924788 V
Gain/Voltage slope at M = 100: T = +20 °C: 166.8081697 V-1     T = -25 °C: 6.156761572 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 166.8081697 V-1     T = -25 °C: 16.29070245 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 67.19911619 V-1     T = -25 °C: 26.39160644 V-1
Break-through voltage: T = +20 °C: 407.2938584 V     T = -25 °C: 371.0445901 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:29:06 CET jreher Updated box and position via API.
11. Aug 2020 18:08:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:48 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:38 CEST jreher Updated box and position via API.
29. Jun 2020 15:58:27 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:50 CEST Tobias Imported from Hamamatsu datasheet.