RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1902020430 - Archived data from Tue, 11. August 2020 18:09:43 CEST


This is all the information about APD 1902020430. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1902020430
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.6 V
Dark current: 11.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 209
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.789119 V     T = -25 °C: 341.5268802 V
Voltage for Gain 150: T = +20 °C: 384.6522921 V     T = -25 °C: 348.8408674 V
Voltage for Gain 200: T = +20 °C: 389.0260958 V     T = -25 °C: 352.9596387 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.685642539 V-1     T = -25 °C: 4.802021621 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.304458275 V-1     T = -25 °C: 9.732848962 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52081318 V-1     T = -25 °C: 15.45733923 V-1
Break-through voltage: T = +20 °C: 403.8783619 V     T = -25 °C: 367.6055045 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:18 CET jreher Updated box and position via API.
11. Aug 2020 18:09:43 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:25:54 CEST jreher Updated APD location via API.
21. Jul 2020 14:25:44 CEST jreher Updated box and position via API.
29. Jun 2020 16:11:42 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:48 CEST Tobias Imported from Hamamatsu datasheet.