RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1901020385 - Archived data from Fri, 05. February 2021 11:15:13 CET


This is all the information about APD 1901020385. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1901020385
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 15.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 209
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6632448 V     T = -25 °C: 343.7249005 V
Voltage for Gain 150: T = +20 °C: 387.4816287 V     T = -25 °C: 351.1659423 V
Voltage for Gain 200: T = +20 °C: 391.8152289 V     T = -25 °C: 355.3693001 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.404003862 V-1     T = -25 °C: 5.007597757 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.620745105 V-1     T = -25 °C: 9.259045873 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.94692199 V-1     T = -25 °C: 14.45420847 V-1
Break-through voltage: T = +20 °C: 406.713014 V     T = -25 °C: 370.7412264 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:14:51 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:50 CEST jreher Updated box and position via API.
05. Feb 2021 11:15:13 CET jreher Updated box and position via API.
11. Aug 2020 18:09:34 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:25:50 CEST jreher Updated APD location via API.
21. Jul 2020 14:25:40 CEST jreher Updated box and position via API.
29. Jun 2020 16:11:14 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:47 CEST Tobias Imported from Hamamatsu datasheet.