RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1804020301 - Archived data from Tue, 11. August 2020 18:08:48 CEST


This is all the information about APD 1804020301. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1804020301
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 429 V
Voltage for Gain 100 (T=+25°C): 403.3 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 330
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 404.0367389 V     T = -25 °C: 366.1101289 V
Voltage for Gain 150: T = +20 °C: 411.6033609 V     T = -25 °C: 373.9607784 V
Voltage for Gain 200: T = +20 °C: 415.7906657 V     T = -25 °C: 378.3318431 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.731817738 V-1     T = -25 °C: 4.570072727 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.670379084 V-1     T = -25 °C: 8.944229298 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35915057 V-1     T = -25 °C: 13.88740458 V-1
Break-through voltage: T = +20 °C: 428.4445012 V     T = -25 °C: 392.9431061 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:30:41 CET jreher Updated box and position via API.
11. Aug 2020 18:08:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:46:20 CEST jreher Updated APD location via API.
21. Jul 2020 14:46:11 CEST jreher Updated box and position via API.
29. Jun 2020 16:08:04 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:45 CEST Tobias Imported from Hamamatsu datasheet.