RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1802020121 - Archived data from Thu, 18. August 2016 11:40:55 CEST


This is all the information about APD 1802020121. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1802020121
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 425 V
Voltage for Gain 100 (T=+25°C): 396.3 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 559
Position in grid: 5
Arrival for irradiation: 11. Aug 2016
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 18. Aug 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:09:31 CEST jreher Updated APD location via API.
15. Nov 2016 11:26:25 CET markus.moritz Entered return for assembly date.
08. Sep 2016 13:37:50 CEST markus.moritz Entered shipped after irradiation date.
24. Aug 2016 14:21:04 CEST christopher.l.hahn Entered annealing information.
18. Aug 2016 11:40:55 CEST markus.moritz Entered irradiation information.
11. Aug 2016 11:45:23 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:52:17 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:47:40 CEST Tobias Imported from Hamamatsu datasheet.