RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1719019873 - Archived data from Mon, 01. August 2016 17:52:16 CEST


This is all the information about APD 1719019873. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1719019873
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 428 V
Voltage for Gain 100 (T=+25°C): 399.3 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 549
Position in grid: 3
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
07. Oct 2016 10:46:35 CEST christopher.l.hahn Entered irradiation information.
05. Oct 2016 15:43:48 CEST markus.moritz Entered shipped after irradiation date.
28. Sep 2016 14:02:22 CEST christopher.l.hahn Entered annealing information.
28. Sep 2016 14:00:43 CEST christopher.l.hahn Entered irradiation information.
23. Sep 2016 09:09:44 CEST markus.moritz Entered arrival for irradiation date.
11. Aug 2016 11:47:22 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:52:16 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:47:33 CEST Tobias Imported from Hamamatsu datasheet.