RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1714019448 - Archived data from Tue, 11. August 2020 17:50:57 CEST


This is all the information about APD 1714019448. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1714019448
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.1 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 266
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.4798564 V     T = -25 °C: 357.8747762 V
Voltage for Gain 150: T = +20 °C: 401.4052002 V     T = -25 °C: 365.3529322 V
Voltage for Gain 200: T = +20 °C: 405.7940165 V     T = -25 °C: 369.7107607 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.395743068 V-1     T = -25 °C: 4.632540057 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.587215634 V-1     T = -25 °C: 9.49905186 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83863991 V-1     T = -25 °C: 17.14413672 V-1
Break-through voltage: T = +20 °C: 417.0352101 V     T = -25 °C: 384.1846076 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:56:13 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:41:33 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:22:36 CET jreher Updated box and position via API.
11. Aug 2020 17:50:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:24 CEST jreher Updated box and position via API.
03. Dec 2019 14:45:29 CET jreher Updated APD location via API.
02. Dec 2019 19:19:47 CET spankonin Updated box and position via API.
02. Dec 2019 19:09:54 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:43:34 CEST Tobias Imported from Hamamatsu datasheet.