RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1713019358 - Archived data from Tue, 11. August 2020 17:50:33 CEST


This is all the information about APD 1713019358. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1713019358
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 260
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.7829602 V     T = -25 °C: 354.5253431 V
Voltage for Gain 150: T = +20 °C: 398.7011093 V     T = -25 °C: 362.080253 V
Voltage for Gain 200: T = +20 °C: 403.0931024 V     T = -25 °C: 366.3437761 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584162878 V-1     T = -25 °C: 4.671433952 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.123628994 V-1     T = -25 °C: 9.048261069 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13777415 V-1     T = -25 °C: 15.8563711 V-1
Break-through voltage: T = +20 °C: 418.3820099 V     T = -25 °C: 382.0307983 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:46 CET jreher Updated box and position via API.
11. Aug 2020 17:50:33 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:17 CEST jreher Updated box and position via API.
05. Dec 2019 14:37:04 CET jreher Updated box and position via API.
05. Dec 2019 14:35:00 CET spankonin Updated box and position via API.
05. Dec 2019 14:33:02 CET spankonin Updated box and position via API.
03. Dec 2019 14:46:20 CET jreher Updated APD location via API.
02. Dec 2019 19:19:18 CET spankonin Updated box and position via API.
02. Dec 2019 19:13:37 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:33 CEST Tobias Imported from Hamamatsu datasheet.