RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1712019313 - Archived data from Tue, 11. August 2020 17:51:06 CEST


This is all the information about APD 1712019313. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1712019313
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 391.3 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 268
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.4101673 V     T = -25 °C: 356.0037964 V
Voltage for Gain 150: T = +20 °C: 400.3185349 V     T = -25 °C: 363.6633306 V
Voltage for Gain 200: T = +20 °C: 404.7095014 V     T = -25 °C: 367.9661114 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.422927682 V-1     T = -25 °C: 4.747471971 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.620448455 V-1     T = -25 °C: 9.395118463 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93587354 V-1     T = -25 °C: 14.61072049 V-1
Break-through voltage: T = +20 °C: 418.5354778 V     T = -25 °C: 383.6812499 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:51 CET jreher Updated box and position via API.
11. Aug 2020 17:51:06 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:48 CEST jreher Updated box and position via API.
03. Dec 2019 14:45:11 CET jreher Updated APD location via API.
02. Dec 2019 19:20:01 CET spankonin Updated box and position via API.
02. Dec 2019 19:09:30 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:32 CEST Tobias Imported from Hamamatsu datasheet.