RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1712019295 - Archived data from Tue, 06. October 2020 16:51:23 CEST


This is all the information about APD 1712019295. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1712019295
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.3 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 268
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.4380473 V     T = -25 °C: 356.8811035 V
Voltage for Gain 150: T = +20 °C: 401.3805293 V     T = -25 °C: 364.5728774 V
Voltage for Gain 200: T = +20 °C: 405.7847285 V     T = -25 °C: 368.8898376 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.373640788 V-1     T = -25 °C: 4.742504828 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.501529993 V-1     T = -25 °C: 9.456334131 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67418903 V-1     T = -25 °C: 14.78770374 V-1
Break-through voltage: T = +20 °C: 421.3573513 V     T = -25 °C: 384.9363989 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:54 CET jreher Updated box and position via API.
07. Oct 2020 12:18:06 CEST jreher Assigned to capsule by script
06. Oct 2020 16:51:23 CEST jreher Updated box and position via API.
11. Aug 2020 17:51:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:50 CEST jreher Updated box and position via API.
03. Dec 2019 14:45:12 CET jreher Updated APD location via API.
02. Dec 2019 19:20:03 CET spankonin Updated box and position via API.
02. Dec 2019 19:08:30 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:32 CEST Tobias Imported from Hamamatsu datasheet.