RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1712019286 - Archived data from Thu, 16. December 2021 13:41:15 CET


This is all the information about APD 1712019286. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1712019286
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.8 V
Dark current: 3.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 268
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.1010743 V     T = -25 °C: 357.5341033 V
Voltage for Gain 150: T = +20 °C: 402.0323975 V     T = -25 °C: 365.2481515 V
Voltage for Gain 200: T = +20 °C: 406.4455544 V     T = -25 °C: 369.5837776 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.500744833 V-1     T = -25 °C: 4.515278464 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.813657826 V-1     T = -25 °C: 8.83655535 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.41932579 V-1     T = -25 °C: 15.38162715 V-1
Break-through voltage: T = +20 °C: 421.8529408 V     T = -25 °C: 385.5223978 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:16:49 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:41:15 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:22:53 CET jreher Updated box and position via API.
11. Aug 2020 17:51:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:49 CEST jreher Updated box and position via API.
03. Dec 2019 14:45:12 CET jreher Updated APD location via API.
02. Dec 2019 19:20:02 CET spankonin Updated box and position via API.
02. Dec 2019 19:08:30 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:32 CEST Tobias Imported from Hamamatsu datasheet.