RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1712019269 - Archived data from Tue, 11. August 2020 17:50:32 CEST


This is all the information about APD 1712019269. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1712019269
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.7 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 260
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.4061944 V     T = -25 °C: 358.7800155 V
Voltage for Gain 150: T = +20 °C: 403.2899564 V     T = -25 °C: 366.4827783 V
Voltage for Gain 200: T = +20 °C: 407.669669 V     T = -25 °C: 370.8125069 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.434957971 V-1     T = -25 °C: 4.763740676 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.691514272 V-1     T = -25 °C: 8.675055286 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13603162 V-1     T = -25 °C: 14.87501677 V-1
Break-through voltage: T = +20 °C: 423.7187037 V     T = -25 °C: 386.4105097 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:45 CET jreher Updated box and position via API.
11. Aug 2020 17:50:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:16 CEST jreher Updated box and position via API.
05. Dec 2019 14:37:03 CET jreher Updated box and position via API.
05. Dec 2019 14:35:00 CET spankonin Updated box and position via API.
05. Dec 2019 14:33:01 CET spankonin Updated box and position via API.
03. Dec 2019 14:46:19 CET jreher Updated APD location via API.
02. Dec 2019 19:19:18 CET spankonin Updated box and position via API.
02. Dec 2019 19:13:37 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:31 CEST Tobias Imported from Hamamatsu datasheet.