RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1711019263 - Archived data from Fri, 05. February 2021 11:22:55 CET


This is all the information about APD 1711019263. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1711019263
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.2 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 268
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.4069975 V     T = -25 °C: 355.1519914 V
Voltage for Gain 150: T = +20 °C: 399.2812044 V     T = -25 °C: 362.8046848 V
Voltage for Gain 200: T = +20 °C: 403.6509926 V     T = -25 °C: 367.0916971 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450986156 V-1     T = -25 °C: 4.701992047 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.628112341 V-1     T = -25 °C: 9.284561257 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.04003683 V-1     T = -25 °C: 14.47529323 V-1
Break-through voltage: T = +20 °C: 413.4839176 V     T = -25 °C: 382.4896763 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:57:52 CET oafedulidis Assigned to capsule by script
01. Dec 2021 12:56:46 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:22:55 CET jreher Updated box and position via API.
11. Aug 2020 17:51:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:50 CEST jreher Updated box and position via API.
03. Dec 2019 14:45:13 CET jreher Updated APD location via API.
02. Dec 2019 19:20:04 CET spankonin Updated box and position via API.
02. Dec 2019 19:08:31 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:31 CEST Tobias Imported from Hamamatsu datasheet.