RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1710019164 - Archived data from Wed, 07. October 2020 15:46:07 CEST


This is all the information about APD 1710019164. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1710019164
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 426 V
Voltage for Gain 100 (T=+25°C): 397.4 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 3003
Position in grid: 3
Arrival for irradiation: 11. Aug 2016
Sent for analysis after irradiation: 02. Sep 2016
Return for assembly: 13. Oct 2016
   
Irradiation:  
Date: 18. Aug 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 2
Bias voltage: 350 V     (not connected)
   
Annealing:  
Date: 18. Aug 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 398.2505562 V     T = -25 °C: 361.8946611 V
Voltage for Gain 150: T = +20 °C: 406.1773395 V     T = -25 °C: 369.7375866 V
Voltage for Gain 200: T = +20 °C: 410.5625305 V     T = -25 °C: 374.1740034 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.54838341 V-1     T = -25 °C: 4.659583945 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.626686939 V-1     T = -25 °C: 8.932137992 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36823482 V-1     T = -25 °C: 13.75676531 V-1
Break-through voltage: T = +20 °C: 425.9611835 V     T = -25 °C: 389.4295748 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:04 CET jreher Updated box and position via API.
03. Feb 2021 18:19:51 CET jreher Updated box and position via API.
07. Oct 2020 15:46:07 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:08 CET jreher Updated APD location via API.
25. Nov 2019 17:14:32 CET jreher Updated box and position via API.
04. Jul 2019 11:11:51 CEST jreher Updated APD location via API.
18. Jun 2019 13:30:06 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 14:03:48 CEST jgrochowski
13. Oct 2016 11:50:18 CEST markus.moritz Entered return for assembly date.
08. Sep 2016 13:37:21 CEST markus.moritz Entered shipped after irradiation date.
24. Aug 2016 14:21:50 CEST christopher.l.hahn Entered annealing information.
18. Aug 2016 11:39:27 CEST markus.moritz Entered irradiation information.
11. Aug 2016 11:44:28 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:52:15 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:42:29 CEST Tobias Imported from Hamamatsu datasheet.