RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0713006457 - Archived data from Wed, 03. August 2016 10:23:22 CEST


This is all the information about APD 0713006457. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0713006457
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 394.1 V
Dark current: 14.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 50
Position in grid: 19
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 12. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:08:52 CEST jreher Updated APD location via API.
06. Oct 2016 09:46:08 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:02:09 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:01:58 CEST markus.moritz Entered arrival for irradiation date.
03. Aug 2016 10:52:05 CEST tobias Repaired loop-off-by-1 error in save script.
03. Aug 2016 10:23:22 CEST tobias Repaired loop-off-by-1 error in save script.
01. Aug 2016 17:27:47 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:12 CEST Tobias Imported from Hamamatsu datasheet.