RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1709019059 - Archived data from Tue, 11. August 2020 17:50:53 CEST


This is all the information about APD 1709019059. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1709019059
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1709019059/2302024316
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.7 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 266
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.7601148 V     T = -25 °C: 356.4278013 V
Voltage for Gain 150: T = +20 °C: 400.7321928 V     T = -25 °C: 364.089342 V
Voltage for Gain 200: T = +20 °C: 405.1537258 V     T = -25 °C: 368.3955744 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.613872458 V-1     T = -25 °C: 4.621028879 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.097713834 V-1     T = -25 °C: 9.102336909 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16503663 V-1     T = -25 °C: 14.08935172 V-1
Break-through voltage: T = +20 °C: 420.1907211 V     T = -25 °C: 383.5972377 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:33 CET jreher Updated box and position via API.
11. Aug 2020 17:50:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:22 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:31 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:11 CET jreher Updated box and position via API.
03. Dec 2019 14:45:27 CET jreher Updated APD location via API.
02. Dec 2019 19:19:45 CET spankonin Updated box and position via API.
02. Dec 2019 19:10:37 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:26 CEST Tobias Imported from Hamamatsu datasheet.